MCA of Metropolitan Washington, Inc. member JPG Plumbing & Mechanical Services, Inc. was approached to partner on a United States Army Corps of Engineers (USACE) Pilot Project. The project’s goal: to convert storage units to house COVID-19 patients undergoing the second stage of treatment to help prevent the spread of the disease.

The project scope included the design, construction and delivery of six negative pressure units to United Medical Center. The negative pressure helps contain the airborne contaminants so that they do not drift to other areas and contaminate patients, staff and sterile equipment.

The notice was received on April 9, and an action plan was implemented to coordinate the logistics and assign technicians to the two-phase project. First, the team installed the mechanical equipment to convert the storage units into patient units. Next, the team delivered the units to United Medical Center and connected the equipment to provide the required patient environment.

Senior Project Manager Steve Brown was challenged with procuring equipment that met the design specifications within a short timeframe. Modifications were made to the original plans to ensure the healthcare professionals were provided areas of “clean air,” which is then directed across the patient areas and out of the unit through the use of high-efficiency particulate air (HEPA) filters and exhaust fans. Brown said, “the project was fast-paced and we were competing with contractors across the country for materials. It was a great team effort by the JPG Plumbing and Mechanical teams and our materials and equipment vendor partners.”

The construction began on April 13 and took only five days. The units were tested and inspected by the on-site USACE engineering team to ensure compliance with the design and specifications. The six units were transported to the United Medical Center the following week and placed in field tents outside the hospital. The JPG Plumbing & Mechanical Services, Inc. team was then able to extend the drain lines and connect the units. Closing the project, the team provided a field demonstration to the end-users on the systems’ use and proper maintenance procedures.

MCAA thanks JPG Plumbing & Mechanical Services, Inc. for their efforts in helping to minimize the impact of COVID-19 on our communities. We will get through this together.

Related Articles
The National Certified Pipe Welding Bureau (NCPWB) has released a new Technical Bulletin that delves into ASME standard PCC-1, Guidelines for Pressure Boundary Bolted Joint Assembly. The bulletin explains what PCC-1 is, and shares lessons learned to help contractors maximize the probability of a leak-free joint. The bulletin also includes requirements for an industry standard certification program for bolted joint assemblers and a troubleshooting guide to assist should a leak occur.…
If you want to fast-track your new and aspiring field leaders, MCAA has just the program! Once a week for 8 weeks, FFL students will spend 90 minutes online with an experienced field leader, who will walk them through best practices and practical strategies of running work and running a crew. From Planning to Leadership, from Documentation to Safety: our instructors break down the ‘why’ and the ‘how’ of things that every foreman must understand to be successful.…
As part of its ongoing commitment to protecting your livelihood and setting the stage for a bright future, MCAA has secured the services of Longbow Public Policy Group to advise our MCAA Government Affairs Committee (GAC). GAC Chair, Jim Gaffney will be passing along information relative to our industry on a regular basis.…
Congratulations to the first IPM graduates of 2026! After two weeks of intensive and immersive education, the students of Classes 95 and 96 have joined the ranks of the more than 2,750+ IPM alumni from MCAA member companies across the country.…
Load More...